The walls after striping and some
plumbing and electrical work done.
Some of the flooring had to be removed to install plumbing. The
original flooring uncovered is tongue & groove fir. This shot is
looking from the accessible bathroom into the adjoining space where the
second bathroom was built.
More plumbing.
Getting there. Our contractor, Matt Clayton.

THE FINISHED ACCESSIBLE BATHROOM
WHAT USED TO BE A CLOSET. INSTANT HOT WATER
IS SUPPLIED TO BOTH ROOMS FROM THE HEATER BY THIS SINK.